fbpx
  1. The Climate-KIC team
  2. Stakeholder mapping
  3. Thursday, 02 April 2015
There are a variety of tools and methods to analyse your stakeholders. A well-known method is called stakeholder mapping. With this method, stakeholders are rated by their level of power/influence (high or low) and their level of interest (high or low). The results are then mapped on a simple 2 x 2 grid.

What do you think of this method of prioritising? Can you see any issues? Can you think of any better ways to rate and map your key stakeholders - especially considering the needs of green business?
Comment
There are no comments made yet.


There are replies in this post but you are not allowed to view the replies from this post.